Commercial Geothermal System for McElroy Manufacturing, Inc.

In 2009, ELS drilled and installed 48 wells at 500 feet for McElroy Manufacturing Company.  We headered and piped all wells to the units inside the building. Then, in 2013, they hired us to install Aquatherm.  Aquatherm is a polypropylene pipe, that was an improved pipe introduced to market in the United States. Aquatherm competes with copper and steel piping applications, nd provided an enhancement to their existing boiler/chiller system. The success of this, and other boiler/chiller projects, have expanded the scope of services offered by our company. 






Our Top 10 Reasons to Get in the Loop