Oklahoma Renewable Energy Geothermal Loop Installation

We pride ourselves in getting the job done right, right from the beginning.

 

The installation process begins with preparing the ground for drilling. A drill rig is used to drill the boreholes where the U-bends will be inserted by the well driller.


Our team then performs the necessary trenching and lays all of the fused HDPE pipes together according to the type of loop system being installed. These pipes are connected to the manifold either inside the building or in an external vault that we establish.


Once all the pipes are set in place, we pressure check the system to detect any possible leaks, and flush out any air or debris through purging. Purging is performed twice to ensure there are no obstructions to prevent flow within the system. Our entire team is trained to ensure each step is carried out seamlessly no matter how big or small the project.